Template library

Diagram templates

429 hand-built templates, each reviewed in every theme and font. Add your content and get a finished, editable SVG.

  • No overflowing labels
  • Restyle in one click
  • Free unlimited edits
  • SVG and PNG export

21 templates

Gantt

phase summary bars · task bars with progress fills · highlighted current period

For a phased plan whose status matters: a product launch by workstream, an office move, a clinical study setup, an event build-up, a system migration.

Journey: trail elevation profile

stage widths to scale · flagged camps at exact heights · summit · current position

Suits one measure that rises and eases across the stages of a journey: effort across a product launch, difficulty along a learning curve, friction along a customer journey, risk across project phases, cumulative cost across a build.

Process: metro map

named routes left to right · bundled shared runs · interchange capsules

Several paths share some steps and not others, and the reader needs to see where they meet and where each goes its own way: learning or career paths sharing core modules, onboarding tracks by role, product workstreams converging on shared milestones, customer journeys by segment sharing touchpoints.

Process: two parallel track ribbons

shared convergence point · keyed contributions

For two ordered efforts that must both feed one shared milestone, review, decision or deliverable: product and marketing before a launch, research and engineering before a release, two teams before a merger or reorganisation, content and logistics before an event, legal and finance before a contract.

Roadmap: arched bridge

one span per phase · span length by duration · elapsed marks at the piers · tiered names above the deck

Suits a plan of consecutive phases whose relative lengths matter and that leads from one state to another: a migration, a product build, a construction or onboarding program, a fundraising or hiring plan.

Roadmap: Gantt bars with per-period amounts

shared period axis · stacked load histogram · capacity line

For effort or hours planned per period across overlapping work: a team's weekly person-days across a campaign launch, a crew's daily hours on a site fit-out, an agency's monthly billable days by client project, or support shift hours across a migration.

Roadmap: isometric period tiles in one corner-on row

stacked equal initiative blocks · stream colors · titles beside each block

Show how much work each period of a plan carries and which streams it comes from: a product roadmap by quarter and team, a Now / Next / Later plan by theme, a marketing calendar by half-year and channel or an operations plan by phase and site.

Roadmap: Now / Next / Later columns

stacked item cards · optional status pills

Three to fifteen pieces of work sorted by how soon they happen rather than by date, such as a product roadmap, a platform plan, or a team's priorities, with optional statuses and horizon notes.

Roadmap: phase-owned work fields

shared prerequisite routes

For compact proposed plans across three named phases, such as an event, a product launch, a system migration, a hiring onboarding or a course redesign, with three to six work records and explicit adjacent-phase prerequisites.

Roadmap: winding road

milestone markers · labels alternating above and below · optional dates

Three to seven milestones on the way to a goal, such as a product's path to launch, a growth plan, a learning path, or a customer's journey to adoption, with or without dates.

Timeline: accordion-folded paper strip

one phase per folded panel · lit and shaded faces · numbered date bands · titled descriptions

Suits a short sequence of phases told as one continuous unfolding story: a product roadmap, an onboarding plan, a campaign or event schedule, a migration in stages.

Timeline: parallel rails

period-aligned milestones · point markers

Two to four parallel tracks (teams, products, or historical streams) across three to six shared periods with two to twelve total milestone events.

Timeline: phase bars

shared period axis · labels on the left · overlaps allowed

Two to eight scheduled phases across two to twelve supplied consecutive periods, such as a launch plan by month, a construction schedule by week, or a hiring plan by quarter.

Timeline: horizontal zigzag

icon-badge cards · optional dates

Three to eight milestones or phases in time order, such as a project rollout, a product launch, a company history, an incident timeline, or a quarterly roadmap, with or without dates.

Browsing is free. One diagram or a batch of four new styles costs 1 credit. Applying saved styles, editing, copying, and downloading are free.